Linyi Zhouxing Building Materials Co., Ltd.
Main products:Steel Keel,Gypsum Board Production Equipment,Gypsum Board
Products
Contact Us
  • Contact Person : Ms. zhou amanda
  • Company Name : Linyi Zhouxing Building Materials Co., Ltd.
  • Tel : 86-539-7168580
  • Fax : 86-539-7168580
  • Address : Shandong,linyi,High-tech Development Zone,Luozhuang District , Linyi City
  • Country/Region : China
  • Zip : 276000

ceiling t grid of pvc gypsum board

ceiling t grid of pvc gypsum board
Product Detailed
T-bar Metal Grid: 1,Much nice; 2,Easy to install; 3,High quality & strong; 4,Suitable for all kinds of mineral wall ceil

ceiling t grid of pvc gypsum board is easy to install,strong,nice . size can be done with H38 or H32 or H26 flat,groove,alloy

1.) ceiling t grid of pvc gypsum board=Flat ceiling T-bar

38#  32# Size:height:32mm 38mmThickness:0.3mm 0.27mmWideth:24mm 22mmLength:3600mm 1200mm 600mm and so on.Raw materials:high-quality hot-dipped galvanized steel coilThe length and thickness can be produced on customer's request

2.)middle groove line tee grid:

38#  32# Size:height:32mm 38mmThickness:0.3mm 0.27mmWideth:24mm 22mmLength:3600mm 1200mm 600mm and so on.Raw materials:high-quality hot-dipped galvanized steel coilThe length and thickness can be produced on customer's request.

 3.)groove t grid:Model No.:32#Size:Height:32mmWideth:24mm 22mm Thickness:0.27mm 0.3mmWideth:24mmThe length:3600mm 1200mm 600mm and so on

The secification can be required by the customer. It is used in the hotel,home,bus station,suppermarket,and office building and etc.

The detail information of the ceiling tee grid (T-Bar, T-grid)

1.)    Be made of hot dip galvanized steel .it is fire tightness , flame retarded,soundproof,anti-aging

2.)    The connector by unique design,when you construct the ceiling, it is easy to install and not to be losened or to be detached each part..

3.)    It is also can be removed and reused without being damaged or without the use of tools.

4.)    Its suspension holes punched on the main tee and cross tee in order to increase the durability and safety of the lay-in grid suspended ceiling system.

Installation steps:

1.)    Determine the requirment ceiling level,mark the position and fix wall angle on the wall.

2.)    Hang main tee with T-bar suspension hook.

3.)    Insert cross tee to the main tee.

4.)    Cross tee adjacent to wall angle light fittings

5.)    Adjust the levels and alignments throughout the entire grid system accurately

6.)    Install PVC gypsum ceiling tile or othermaterials ceiling panel.

ceiling t grid of pvc gypsum board



Copyright Notice @ 2008-2022 ECVERY Limited and/or its subsidiaries and licensors. All rights reserved.